Skip to content
Pletoxstudio
Studio
ERP

PRODUCTION DEMAND, STOCK & SHORTAGES

Plan materials and review stock shortages.

Calculate the materials needed for production. Review requirements against stock, check allocations, and share the remaining shortages with purchasing and stores.

Book an ERP demo See features
Included in Growth and Advance
pletox ERPMeridian EngineeringNK
Material planning MRP-0068
Support frame · 20 NosMaterial requirementsMain plant · Raw-material location RM-01
Completed
Component lines3Items with shortages2
Steel tube12,000 mm short
M8 bolt60 Nos short
Review shortages before KIT posting.
Illustrative workspace · Sample data

MATERIAL PLANNING FOR YOUR TEAM

Compare material requirements with available stock.

Start with the products and quantities you need to make. Use their BOMs to calculate material requirements, review stock allocations and identify shortages before deciding the next purchase or production action.

Set the production demand

Choose a warehouse and enter KIT codes and quantities, using their BOMs as the basis for material calculations.

Check stock allocations

Review the quantities allocated against each material requirement and the balance still needed.

Review and share shortages

Export the material requirements for purchasing and production, and rerun planning when the inputs change.

PRODUCTION DEMAND & BOM INPUTS

Start with the products
and quantities you need to make.

Select the warehouse, add the KIT codes and enter the quantities to plan. You can add multiple items or paste codes and quantities into the planning rows. Check their BOMs before starting the run.

01

Select the warehouse

Plan against stock in the chosen warehouse and its configured raw-material location.

02

Enter KIT codes and quantities

Add the items you need to plan. Review the corresponding BOM output quantities, components and units.

03

Track the planning run

Start processing and follow the run from Draft to Running to Completed before reviewing its requirements.

Explore BOM & change control
pletox ERPMeridian EngineeringNK
MATERIAL PLANNING RUN

MRP-0068

Completed
WarehouseMain plant
Run date06 Nov 2026
PLANNED KIT & QUANTITY
KITFG-0042

Support frame

Finished product · FG-0042

20Nos
BOM-0042BOM output: 1 Nos · 3 component lines
DraftRunningCompleted

A run can include multiple KIT codes and quantities.

Illustrative workspace · Sample data

MATERIAL REQUIREMENTS & SHORTAGES

See what is required,
allocated and still short.

Review requirements against each source product, or use the aggregate view to combine shared components across the run. Check the quantities and Buy, Make or Kit classifications before deciding the next action.

pletox ERPMeridian EngineeringNK
REQUIREMENT DETAILS · MRP-0068

20 support frames KITFG-0042

2 items short
Main plant / RM-01BOM output: 1 NosSource product: FG-0042
Material requirements, allocations and shortages for 20 support frames
Material / unitRequiredAllocatedShortage
Steel tubeRM-0012 · mm · Buy36,00024,00012,000
Base plateRM-0021 · Nos · Buy80800
M8 boltFT-0008 · Nos · Buy16010060
Illustrative workspace · Sample data

Required quantity

The material needed for the planned output, calculated using the BOM quantities.

Allocated quantity

The quantity allocated against the requirement in the planning results.

Shortage quantity

The remaining requirement for purchasing or production to review.

pletox ERPMeridian EngineeringNK
MATERIAL ALLOCATION · RM-0012

Steel tube

Shortage
SOURCE PRODUCTSupport frame · 20 Nos
Required quantity36,000 mm
Allocated24,000 mm
Shortage12,000 mm
Main plantRaw-material location · RM-01

Planning allocation for this run. Stock is not reserved across separate runs.

Illustrative workspace · Sample data

STOCK & REQUIREMENT ALLOCATIONS

Review the stock
assigned to a requirement.

Stock is allocated across requirements within the run. Review the item, source product and quantity covered, then identify the balance that needs attention.

01

Check the source product

See which planned product generated the component requirement.

02

Review the quantity covered

Check the stock allocated to the requirement. Shared material stock is apportioned across the requirements within that run.

03

Follow up on the shortage

Discuss the balance with stores, purchasing or production before taking the next action.

Allocation is part of planning. It does not reserve inventory across separate MRP runs or issue materials to production.

Explore stock & warehouses

MATERIAL REQUIREMENT EXPORTS

Share the requirements
with purchasing and production.

Export aggregate requirements to Excel or open the print preview to print or save a PDF. Share one combined list of materials across the planned products, with quantities and item references for follow-up.

01

Review the combined material list

Use the aggregate view to review shared components across the planned products.

02

Download Excel or print the results

Share item codes, required quantities, available stock and shortages with the relevant team.

03

Agree the next action

Use the reviewed results to decide what to purchase, make or check with stores.

Purchasing stays a reviewed action. Confirm the quantities and supplier details before creating a purchase order.

pletox ERPMeridian EngineeringNK

Material requirements

Aggregate results · Excel export

MRP-0068Main plant · 06 Nov 2026
Illustrative aggregate requirement export with available stock
Item / unitRequiredAvailableShortage
RM-0012mm36,00024,00012,000
RM-0021Nos801000
FT-0008Nos16010060
Excel (.xlsx)Print / save as PDF

Aggregate available stock is shown here. The detailed view shows the quantity allocated to each requirement.

Illustrative workspace · Sample data

RERUN, REVIEW & POST KIT

Review shortages
before moving to KIT posting.

Keep the calculation and the stock-posting step separate. Recalculate against current stock and BOMs, review shortages, then use Post KIT when the requirements are covered.

01 / RE RUN

Refresh the requirements

Rerun the saved KIT quantities against current stock and BOMs. This replaces the existing requirement results in the same run.

02 / REVIEW

Resolve the shortages

Review any remaining material shortage with purchasing and stores. Use a new planning run when the required output quantities change.

03 / POST KIT

Post the production KITs

The screen enables Post KIT when no shortages remain. Posting creates KIT records and stock movements according to the configured posting mode.

Explore production

MATERIAL PLANNING QUESTIONS

Material requirements
planning FAQs.

Discuss your planning workflow
How are material requirements calculated?

The calculation uses the required output and the BOM’s output and component quantities. For example, a BOM for one frame using four base plates needs 80 plates for a planned output of 20 frames, before stock and allocation review.

Does a planning allocation reserve stock?

No. Stock is apportioned to requirements within the run, but this does not reserve inventory across separate runs. Material movement happens through the relevant stock-posting workflow, such as Post KIT.

Can we plan several products in one run?

Yes. Add multiple KIT codes and quantities for the selected warehouse. The aggregate view combines shared component requirements across those products.

What does Re Run update?

It reuses the saved KIT quantities and rebuilds requirements against current BOMs and stock, replacing the results in the same run. Use a new run for changed output quantities. The screen offers rerunning before KIT posting.

Can we export the material requirements?

Yes. Aggregate requirements can be downloaded as Excel files. A print preview also supports printing or saving as PDF through your browser.

Does MRP automatically place orders or optimise capacity?

No. MRP calculates requirements and shortages from entered demand and BOMs. The team reviews purchasing separately. It does not automatically create purchase orders or schedule machine capacity. We review your BOM structure and planning scenario during implementation.

Which plans include material requirements planning?

Material requirements planning is included in Growth and Advance, together with BOMs, production and quality inspection. Both plans also include the sales, purchase, inventory and finance modules from Basic.

INCLUDED FROM GROWTH

Plan materials
alongside BOMs and production.

Growth brings material requirements, stock allocations and shortage review together with BOMs, production kits and quality inspection.

Growth perpetual licence₹4,00,000

Up to 2 companies · 100 GB shared storage
First-year hosting and support included.
15% annual hosting and support from year two. Taxes extra.

Compare ERP plans