Skip to content
Pletoxstudio
Studio
ERP

MATERIAL ISSUES, RECEIPTS & SUPPLIER BALANCES

Track materials sent for job work.

Send material with job-work challans, receive the finished output and account for the material consumed. Check what remains with each supplier.

Book an ERP demo See features
Included in Advance
pletox ERPMeridian EngineeringNK
Supplier material 06 Nov 2026
Precision Hose WorksRubber hoseRM-0012 · 2 released challans
Partial
Material sent100 mWith supplier78 m
22 m consumedAllocated across 2 challans
100 cut pieces receivedGRN-0086 · Finished output
Illustrative workspace · Sample data

MATERIAL OUT, FINISHED GOODS IN

Manage outward material and job-work receipts.

Keep the material sent, the output received and the material consumed in separate records. Use challans, receipts and supplier balances to follow each stage of the job work.

Document outward material

Prepare outward challans with material quantities and supplier details before sending goods for processing.

Track supplier-held stock

Review material balances and consumption allocation associated with the supplier and job-work records.

Reconcile the return

Capture receipts and use reconciliation reports to follow the quantities returning from the subcontractor.

OUTPUT, MATERIAL & CONSUMPTION

Set the material needed
for each finished item.

Define the job-work output and its material consumption rule. Include the consumption unit and wastage allowance so the receipt can calculate the required material quantity.

01

Choose the output and supplier

Set up a rule for an output item, with a supplier-specific process or one available across suppliers.

02

Set consumption and wastage

Enter material usage for the defined output quantity. Add fixed wastage or a wastage percentage where required.

03

Convert to the material’s stock unit

Use the item’s configured unit conversion when consumption is measured differently from stock.

For example: 200 mm of hose plus 20 mm wastage consumes 0.220 m for each cut piece received.

pletox ERPMeridian EngineeringNK
JOB-WORK PROCESS · JW-PROC-0042

Cut hose 200 mm

Active
OUTPUT ITEMFG-0042 · Cut hose 200 mmFor each 1 Nos received
Supplier
Precision Hose Works
Material
Rubber hose · RM-0012
Consumption200 mm
Fixed wastage20 mm
Stock unit: m 1 m = 1,000 mm
Material per cut piece0.220 m

200 mm + 20 mm · No percentage wastage

Illustrative workspace · Sample data
pletox ERPMeridian EngineeringNK
JOB-WORK CHALLAN · 04 NOV 2026

JW-0042

Released
FROM WAREHOUSEMain plant
TO SUPPLIERPrecision Hose Works
MATERIAL SENTRubber hoseRM-0012 · Raw material
80 m
Earlier challan JW-0041 · 20 m02 Nov 2026 · Released
Total material sent100 m
Job-work challan PDF
Illustrative workspace · Sample data

JOB-WORK PURCHASE ORDERS & CHALLANS

Send material with
a job-work challan.

Use a job-work purchase order for the supplier and the output to receive. Create outward challans for the raw material being sent, with its quantity and warehouse details.

01

Prepare the job-work order

The PO identifies the supplier, receiving warehouse and output item. Job-work POs support the open-order receipt flow.

02

Record each material dispatch

Choose a job-work challan type and record the material, quantity, supplier and stock location.

03

Release and share the challan

Release records the outward stock movement. Download the job-work challan PDF for the dispatch.

Explore purchases & receipts

GOODS RECEIPTS & CHALLAN ALLOCATION

Receive finished goods
and reconcile material.

Create a goods receipt against the released job-work PO. Review the material consumption for the received output. On release, consumption is allocated against the supplier’s oldest eligible challan balances first.

pletox ERPMeridian EngineeringNK
GOODS RECEIPT · 06 NOV 2026

GRN-0086 Precision Hose Works

Released
OUTPUT RECEIVED100 Nos

Cut hose 200 mm · FG-0042

MATERIAL CONSUMED22 m

100 Nos × 0.220 m per piece

JOB-WORK POPO-JW-0018

Receiving warehouse · Main plant

Material allocated to this receipt

Rubber hose · Oldest challans first
Raw-material quantities in metres allocated to goods receipt GRN-0086
ChallanSentConsumedBalanceRegister
JW-0041 02 Nov 202620 m20 m0 mClosed
JW-0042 04 Nov 202680 m2 m78 mPartial
Total material100 m22 m78 m

22 m of raw material accounted for. 78 m remains against JW-0042.

Illustrative workspace · Sample data

Output received

Record the finished item and quantity received from the supplier: 100 cut pieces in this example.

Material consumed

Apply the configured rule: 100 pieces × 0.220 m uses 22 m of raw hose.

Oldest challans first

Allocate 20 m from the first challan and 2 m from the next, leaving 78 m available.

MATERIAL BALANCE & RECONCILIATION REPORTS

Check the material
still with each supplier.

Use the stock availability report to review outstanding material balances by challan. Use the reconciliation report to trace material consumption to the goods receipts that used it.

01

Review outstanding balances

Filter by supplier, warehouse, material or register status to find the balances you need to follow up.

02

Trace consumption to a receipt

The reconciliation report shows challan details, GRN references, material consumed and the running pending quantity.

03

Export the records to Excel

Download stock availability and reconciliation reports for supplier discussions and internal review.

Explore ERP reports
pletox ERPMeridian EngineeringNK
Supplier stock availability
Precision Hose WorksMain plant
RUBBER HOSE · RM-0012

JW-0042

04 Nov 2026
Partial
Sent
80 m
Consumed
2 m
AVAILABLE MATERIAL78 m

Balance against this challan

Reconciliation links the 2 m consumed from this challan to GRN-0086.

Download report as Excel
Illustrative workspace · Sample data

CHECKS BEFORE RECEIPT RELEASE

Check the material
behind each receipt.

Review the output quantity, selected raw material and required consumption before releasing a job-work receipt.

Eligible challans

Receipt allocation uses released job-work challans for the PO supplier, with available material in open or partial registers.

Sufficient material

The release checks the current supplier material balance before applying consumption to the challans.

Recorded allocations

Each allocation keeps the consumed quantity against its source challan item and receipt item for reconciliation.

SUBCONTRACTING QUESTIONS

Job-work
management FAQs.

Discuss your job-work process
Can received goods differ from the material sent?

Yes. The job-work PO identifies the output item, while the challan identifies the material sent. The configured consumption rule relates the selected material to the output received.

Can consumption use a different unit from stock?

Yes, using the item’s configured stock unit, second unit and conversion factor. For example, consumption in millimetres can be converted into metres of raw-material stock.

How are wastage allowances handled?

The consumption rule can include a fixed wastage quantity and a percentage of the consumption quantity. These allowances are included when calculating material required for the received output.

What happens when material was sent on several challans?

Consumption is allocated to the oldest eligible challan balances for that supplier and material. One receipt can use material from more than one challan, and the allocations appear in reconciliation.

Can we review material still with a supplier?

The subcontracting workflow provides supplier material balances and reconciliation reports. Your issue, consumption and receipt steps are mapped during implementation.

Which ERP plan includes subcontracting?

Subcontracting and job work are included in Advance, alongside shop-floor performance, integrations and HRM, plus the manufacturing modules in Growth.

INCLUDED IN ADVANCE

Manage job work
alongside production.

Advance brings subcontracting, shop-floor performance, integrations and HRM together with the sales, purchases, inventory, finance and manufacturing modules.

Advance perpetual licence₹7,00,000

Up to 2 companies · 100 GB shared storage
First-year hosting and support included.
15% annual hosting and support from year two. Taxes extra.

Compare ERP plans